You are using an outdated browser. Please upgrade your browser to improve your experience.
OK, thanks
Mon Nov 05 2018 00:00:00 GMT+0000 (GMT)

ACS were called in by Speller Metcalfe to manually prepare and re-surface natural stone work on a grade 1 listed building.

Salt corrosion and the harsh elements raining down on the building have caused spalling and severe deterioration of the natural stone. ACS need to carefully remove the defective layers from the stone face and prep the areas ready for the stone masons to re-point the building.

Back to our News